국제학술발표논문집 (International conference on construction engineering and project management)
- The 1th International Conference on Construction Engineering and Project Management
- /
- Pages.1094-1099
- /
- 2005
- /
- 2508-9048(eISSN)
THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS
- Kyu-Man Cho (Dept. of Architectural Engineering, Univ. of Seoul) ;
- Kyo-Jin Koo (Dept. of Architectural Engineering, Univ. of Seoul) ;
- Chang-Taek Hyun (Dept. of Architectural Engineering, Univ. of Seoul)
- 발행 : 2005.10.16
초록
Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.