3-Dimensional FE Analysis of Construction Stages of The Cable-stayed Bridge with Steel-box Girder

강박스 사장교의 시공단계를 고려한 3D 상세 유한요소 해석

  • 이태열 (삼성물산 건설부문 토목기술팀) ;
  • 김영훈 (삼성물산 건설부문 토목기술팀) ;
  • 신현양 (삼성물산 건설부문 토목기술팀) ;
  • 김재권 (삼성물산 건설부문 토목기술팀)
  • Published : 2005.04.01

Abstract

Rigorous FE(Finite Element) analyses of the cable-stayed bridge with steel-box girder, the main construction method of which is FCM (Free Cantilever Method), are presented in this paper. The analysis and the checking of design for a derrick crane under several loading conditions are performed using the software MIDAS/Civil and the beam elements are used to model the main structure. Among all the construction stages, special construction stages are chosen and considered to ensure the safety of segments of box girder The stress analysis for lifting of a segment of box girder is performed using the software SAP2000 and the shell elements of which having 6 DOF(Degrees Of Freedom) per nodes are successfully used to model the segment of box girder for the purpose of capturing the detailed behaviors on the folded-plates in the segment. Finally, concluding remarks are given to improve a design of the derrick crane and the segment based on the results from this study.

Keywords