Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2005.05a
- /
- Pages.843-848
- /
- 2005
A study of application for train station of step by step construction method of ADS
자율분산시스템 단계적 구축방식의 철도역 적용에관한 연구
- Ahn Jin ;
- Kim Ryu-ho ;
- Lee Young-Soo ;
- Kim Eun-Hee ;
- Hong Soon-Heum ;
- Kim Young-Hoon ;
- Park Bum-Hwan
- 안진 (경봉기술(주)) ;
- 김유호 (경봉기술(주)) ;
- 이영수 (경봉기술(주)) ;
- 김은희 (경봉기술(주)) ;
- 홍순흠 (한국철도기술연구원) ;
- 김영훈 (한국철도기술연구원) ;
- 박범환 (한국철도기술연구원)
- Published : 2005.05.01
Abstract
Currently the train traffic control system is built wholly by one package construction. It is under variable circumstance such as variation of signalling equipment and station expansion. This condition reduces system reliability and availability. And the term of system change is longer than 10 years, so it is hard to update to the latest technology and the new function. In order to do the system should be replaced to new one completely. The step by step construction of ADS(Autonomous Decentralized System) is one of the solution. So the simulation of it on the real station help to find system requirement and verify good of online expansion and online test.
Keywords