A Study on Construction Method for Joints between Old and New Concrete Deck Slabs

콘크리트 교량 바닥판 신구접합부의 시공방안에 관한 연구

  • 백낙승 (서울대학교 지구환경시스템공학부) ;
  • 최영철 (서울대학교 지구환경시스템공학부) ;
  • 차수원 (서울대학교 지구환경시스템공학부) ;
  • 오병환 (서울대학교 지구환경시스템공학부)
  • Published : 2005.11.01

Abstract

When widening or repairing concrete deck slab, there is a joint inevitably. However, joining-construction method have following problem, that is the additional stress in existing part of bridge resulting from the specific process of joining-construction and the difference of amount of shrinkage between new and existing bridge. On this study, compared shrinkage stress of the direct joining construction method with the indirect joining construction method, and concluded the proper substitution rate of expansion cement. The rate of replacement was proper at $10\%$. but more than $15\%$, concrete had excessive expansion and weeker compressive strength. The time of placing closure concrete, considering the shinkage stresses and creep, was suitable in $45\~60$ days after placing the new concrete deck slab.

Keywords