Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2005.11a
- /
- Pages.363-366
- /
- 2005
A Study on Construction Method for Joints between Old and New Concrete Deck Slabs
콘크리트 교량 바닥판 신구접합부의 시공방안에 관한 연구
- Published : 2005.11.01
Abstract
When widening or repairing concrete deck slab, there is a joint inevitably. However, joining-construction method have following problem, that is the additional stress in existing part of bridge resulting from the specific process of joining-construction and the difference of amount of shrinkage between new and existing bridge. On this study, compared shrinkage stress of the direct joining construction method with the indirect joining construction method, and concluded the proper substitution rate of expansion cement. The rate of replacement was proper at
Keywords