Estimation of Stress Variations on Time Effects in Prestressed Concrete Composite Girder Bridges

PCS 합성거더교의 시간에 따른 응력 변화 추정

  • 윤지훈 (수원대학교 토목공학과) ;
  • 김수만 (수원대학교 토목공학과)
  • Published : 2005.11.01

Abstract

When a concrete structure is subjected to load, its response is both immediate and time dependent. Under sustained load, the deformation of a structure gradually increases with time and eventually may be many time greater than its instantanneous value. The gradual development of strain with time is caused by creep and shrinkage. On this study, to estimate of stress variations on time effects in partially prestressed concrete composite girder bridges, computer program applied Age-adjusted Effective Modulus Method(AEMM) in used.

Keywords