Design of a large shield tunnel in Seoul subway line No.7 extension project(703 section)

서울지하철 7호선연장 703공구 대구경 쉴드터널 설계

  • Published : 2005.11.01

Abstract

In this paper a design of a large shield Tunnel through weathered soil and weathered rock in 703 section of seoul subway line No.7 extension project is presented. The geological investigation results show that the projecet region consists mostly of weathered soil with some local weathered rock in the tunnel excavation level. A EPB shield TBM is selected as a optimal excavation machine for the large shield Tunnel considering the geological and site conditions. Also, the shield machine head and cutter for the large shield tunnel type are designed considering site geological conditions and average advance rate in similar projects.