대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
- /
- Pages.644-646
- /
- 2005
500 kV 송전계통의 개폐과전압과 공기절연거리 설계
Switching Surge Overvoltage and Air Clearance Design of 500 kV Transmission System
- Shim, E.B. (Korea Electric Power Research Institute) ;
- Kwak, J.S. (Korea Electric Power Research Institute) ;
- Woo, J.W. (Korea Electric Power Research Institute) ;
- Han, K.S. (Korea Electric Power Research Institute) ;
- Kwon, D.J. (Korea Electric Power Research Institute)
- 발행 : 2005.07.18
초록
The air clearance of the transmission tower is determined by the switching overvoltage of the system, and the insulator length is determined by contamination design. This paper described the switching overvoltage analysis result of 500 kV system and air clearance design. The overvoltage include fault initiation, fault clearing, closing and reclosing overvoltages. We illustrated the contamination design example, air clearance design of a tower considering swing angle of the conductor.
키워드