Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2005.07a
- /
- Pages.9-11
- /
- 2005
Master Plan for Long-term Transmission System in Myanmar
미얀마 장기 계통계획 수립 결과 및 전망
Abstract
kEPCO is now conducting a project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the rover System Network Analysis in Myanmar" performed from 2001 to 2002. As a part of this project, this paper deals with the analysis process and results of the demand forecasts, master plan for transmission system expansion, and the major factors for the new 500kV transmission facilities.
Keywords