Optimal Periodic PM Schedules Under $ARI_1$ Model with Different Pattern of Wear-Out Speed

  • Lim Jae-Hak (Department of Accounting, Hanbat National University)
  • Published : 2005.06.01

Abstract

In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate of amount proportional to the failure intensity, which increases since the last PM and slows down the wear-out speed to that of new one. And the proportion of reduction in hazard rate decreases with the number of PMs. Our model is similar to $ARI_1$ proposed by Doyen and Gaudoin(2004) in the sense of reduction of hazard rate. Our model has totally different wear-out pattern of hazard rate after PM's, however, and the proportion of reduction depends on the number of PM's. Assuming that the system undergoes only minimal repairs at failures between PM's, the expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

Keywords