The Progress of Fast Reactor Technology Development in China

  • Published : 2004.02.01

Abstract

China, as a developing country with a great number of population and relatively less energy resources, reasonably emphasizes the nuclear energy utilization development. For the long term sustainable energy supply, as for nuclear application the basic strategy of PWR-FBR-Fusion has been settled and envisaged. Due to the economy and experience reasons the nuclear power and technology development with a moderate style are kept in China up to now. In China mainland apart from two NPPs with the total capacity of 2.1 GWe in operation, four NPPs are under construction and two NPPs are planned for the Tenth Five Year Plan(2001-2005). Also another one or two NPPs are still in discussion. It could be foreseen that the total nuclear power capacity will reach 8.5GWe before the year 2005 and 14-15 GWe before 2010 respectively. As the first step for the Chinese fast reactor engineering development the 65MWt China Experimental Fast Reactor(CEFR) is under construction. The main components of primary, secondary and tertiary circuits and of fuel handling system have been ordered. The reactor building under construction has reached the top namely 57m above the ground. More than one hundred components and shielding doors have been installed. It is planned that the construction of reactor building with about 40,000$m^2$ floor surface will be completed in the end of the year 2002 and envisaged that the first criticality of the CEFR will be in the end of 2005. The second step of the Chinese fast reactor engineering development is a 300MWe Prototype Fast Breeder Reactor which is only under consideration up to now. Some important technical selections have been settled, but its design has not yet started.

Keywords