Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2004.10a
- /
- Pages.1419-1424
- /
- 2004
A study on Risk Assessment for Electric Railway on Choongang Line
중앙선 전철/전력분야 위험도 평가 연구
- Published : 2004.10.01
Abstract
Railway safety is based on a risk analysis and safety assessment for the whole railway system as human, train, electric, signaling, operation, maintenance and etc. Therefore in this study, after investigating the accidents happened in electric railway on Choongang line for 5 years, from '97 to '01, a Data-Base was made through a cause and result analysis. In consideration of economic loss and human resources damage, a risk assessment for electric railway was also performed.
Keywords