Current Collection Performance of Catenary System within Tunnel Section

터널구간 가선계의 집전성능

  • 손건호 (성균관대학교 대학원) ;
  • 이승일 (한국철도대학 차량기계과) ;
  • 최연선 (성균관대학교 기계공학부)
  • Published : 2004.06.01

Abstract

A dynamic simulation program of a catenary-pantograph system including tunnel section and transient section is developed in this study. The simulation program can accommodate for the pantograph of two panheads and three d.o.f model. Using the developed program, the dynamic characteristics with a SCHUNK'S WBL 85-PANTOGRAPH is analyzed at the conventional TAEBAEK line and its tunnel section when the catenary system is supported by a tunnel bracket. The simulation results show that the variation of contact force and uplift displacement is allowable in general section and the entrance and exit of a tunnel, but the uplift displacement and the separation ratio within tunnel section is difficult to allow.

Keywords