한국건설관리학회:학술대회논문집 (Proceedings of the Korean Institute Of Construction Engineering and Management)
- 한국건설관리학회 2003년도 학술대회지
- /
- Pages.217-221
- /
- 2003
공동주택공사에서의 공기지연 리스크분석에 관한 연구
A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects
- 발행 : 2003.11.01
초록
본 연구에서는 공동주택공사에서 발생하는 공기지연 리스크에 대한 분류체계와 분석방법을 제안하였다. 서울
This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.