Calculation of TRM and CBM for Electricity Market Restructuring

전력 산업 구조 개편 상황에서 적정 송전 용량 여유도 산정

  • Published : 2003.11.13

Abstract

Available Transfer Capability(ATC) calculation is a complicated task, which involves the determination of TTC, TRM, and CBM. This paper proposed QFA method, which can reduce the calculation time comparing with CPF method and has few errors in ATC calculation. It proved that the method can calculate ATC more fast and accurately in the case study using IEEE 24 bus RTS(MRTS).

Keywords