Analysis of the Disposal Tunnel Spacing and Disposal Pit Pitch for the HLW Repository Design

심지층 처분시설 설계를 위한 처분터널 및 처분공 간격 분석

  • Published : 2003.11.01

Abstract

In this study, analysis of the disposal tunnel spacing and disposal pit pitch was carried out, as a factor of the design to estimate the scale and layout of the repository To do this, based on the reference repository concept and the engineered barrier concept, the cross section of the disposal tunnel and disposal pit are established and the mechanical and thermal stabilities of the tunnels are analyzed. Also, the optimized disposal tunnel spacing and the disposal pit pitch which minimize the excavation volume was proposed. The detailed analyses by the exact site characteristics data are needed to reduce the uncertainty of the site in the future.

본 연구에서는 고준위 방사성폐기물 심지층 처분시설의 규모 및 layout 설정에 필요한 요소인 처분터널 및 처분공 간격에 대한 분석을 수행하였다. 이를 위하여, 기준 처분개념 및 공학적 방벽개념을 바탕으로 처분터널 및 처분공 단면을 설정하고, 단층 및 복층 개념에 따른 처분동굴의 구조적, 열적 안정성을 분석하였다. 분석 결과를 바탕으로 설계에 있어서 주요한 인자 중의 하나인 굴착량을 최소화할 수 있는 처분동굴 및 처분공 간격을 제안하였다. 향후, 부지에 대한 불확실성을 줄이기 위하여 정확한 부지특성 자료를 통한 상세한 분석이 필요하다.

Keywords