고속철도차량의 유지보수계획

Rolling Stock Maintenance Scheduling for High-Sneed Railway

  • 김동희 (한국철도기술연구원, 운영ㆍ정보시스템연구팀) ;
  • 홍순흠 (한국철도기술연구원, 운영ㆍ정보시스템연구팀)
  • 발행 : 2003.05.01

초록

The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

키워드