Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2003.10c
- /
- Pages.653-658
- /
- 2003
A study on the moving picture transmission method between the accident sites and control center(II)
사고현장과 사령실간 화상전송기술에 관한 연구(II)
- Published : 2003.10.01
Abstract
This study is represented a method to give connect to optical cable from accident site and reviewed the method to transmission a moving image to control centre by real time, following the study of image transmission method in copper cable section where is a main line of railroad communication. Concept of network is studied to use cable and equipment effectively, and it's also reviewed technology of digital image transmission system and image evaluation methods, in spite of the pixel of camera and monitor resolution determine quality of image when moving image transferring by point to point. In addition, this study is reviewed checks and considerations of image transmission equipment (codec) with various transmission methods in room test, and then examined and analyzed wire/wireless combined transmission methods at wayside.
Keywords