Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2003.10b
- /
- Pages.477-482
- /
- 2003
Performance Verification for High Speed Railway Bridge on Test Operation of KTX
KTX 시운전시 고속철도 교량의 성능검증
- Published : 2003.10.01
Abstract
The railway bridges on the new high-speed line are the first structures designed and constructed by our local engineers for high-speed running. In securing running stability and riding comfort in high-speed running, it is very important to verify the performance of structures and local specifications and design criteria by measuring and analyzing the dynamic behavior of main structural members. In this study, 4 different types(simple-span, 2, 3, 4-continuous spans) of PCS Box bridges on the test line(Yongwa
Keywords