A case study on the efficiency test of groundwater drainage system for Taejon LNG Pilot Cavern
- Lee Dae-Hyuck (SK Engineering & Constructuion Co.,Ltd) ;
- Lee Chul-Wook (SK Engineering & Constructuion Co.,Ltd) ;
- Do Hyo-Lim (SK Engineering & Constructuion Co.,Ltd) ;
- Kim Ho-Yeong (SK Engineering & Constructuion Co.,Ltd) ;
- Bodin Jean-Luc (Geostock) ;
- Amantini Eric (Geostock)
- Published : 2003.11.01
Abstract
For Taejon LNG Pilot Cavern being constructed to verify the technical aspects for storing LNG in lined rock cavern, efficiency tests of groundwater drainage system composed of many pumps and boreholes were performed around the cavern before and after the construction of concrete lining. Through evaluation of water balance and monitoring of pressures and flowrates, even if the present drainage system is very good for reducing water entries into the cavern, non-negligible water is still flowing in the floor of the cavern concrete due to heavy rainfall. To improve the drainage efficiency, additional drainage holes and some grouting were planned.
Keywords