Construction and Management of Hydrological Observation Network in Yi-dong Rural Basin

농촌유역 수문관측망 구축.운영(이동유역)

  • Published : 2002.10.12

Abstract

Yi-dong experimental basin is operated for research on the rural basin characteristics and accumulation of a long term data by hydrological observation equipments. It is basin area 9,440ha, length 14.4km and slope 0.67%. Hydrological observation network is constructed of rainfall meter 4points, reservoir storage level 3points and river water level 2points.

Keywords