초지연제의 응결시간차에 따라 분할타설된 매스 콘크리트의 수화열 저감

Reduction of Hydration Heat in Division-Placed Mass Concrete Considering the Difference of Setting Time in Super Retarding Agents

  • 발행 : 2002.10.01

초록

This study is designed to reduction of hydration heat of 4 layer division-placed mass concrete considering the difference of setting time of super retarding agent. According to the results, peak temperature of plain concrete by hydration heat show $63^{\circ}C$ around the age of 1 days. Hydration heat is lowest in the bottom layer, and highest in the middle of 3rd layer from the bottom. Hydration heat of mock up structure, which is division-placed at the same interval of 1 and 2 days by setting time difference of super retarding agent, is highest in the bottom layer because after peak temperature of 4th layer, hydration reaction progresses in order of 3rd, 2nd and 1st layer. But in mock up structure which is division-placed at the various interval. peak temperature by hydration heat is reduced by about $13^{\circ}C$, compared with plain concrete because after first peak hydration heat of 4th layer (plain concrete), hydration reaction progresses after the drop of hydration heat in order of 3rd, 2nd and 1st layer.

키워드