Large Step Optimization Approach to Flexible Job Shop Scheduling with Multi-level Product Structures

다단계 제품 구조를 고려한 유연 잡샵 일정계획의 Large Step Optimization 적용 연구

  • Published : 2002.05.01

Abstract

For companies assembling end products from sub assemblies or components, MRP (Material Requirement Planning) logic is frequently used to synchronize and pace the production activities for the required parts. However, in MRP, the planning of operational-level activities is left to short term scheduling. So, we need a good scheduling algorithm to generate feasible schedules taking into account shop floor characteristics and multi-level job structures used in MRP. In this paper, we present a GA (Genetic Algorithm) solution for this complex scheduling problem based on a new gene to reflect the machine assignment, operation sequences and the levels of the operations relative to final operation. The relative operation level is the control parameter that paces the completion timing of the components belonging to the same branch in the multi-level job hierarchy. In order to revise the fixed relative level which solutions are confined to, we apply large step transition in the first step and GA in the second step. We compare the genetic algorithm and 2-phase optimization with several dispatching rules in terms of tardiness for about forty modified standard job-shop problem instances.

Keywords