Cryogenic Distillation Apparatus for Hydrogen Isotopes Separation

수소동위원소 분리를 위한 초저온증류장치

  • Published : 2001.02.01

Abstract

KEPCO has a plan to construct TRF (tritium removal facility) in wolsong nuclear power plant site by 2005. In advance of WTRF construction, the pilot plant was installed at KEPRI in order to show process reliability of WTRF. The main processes of this pilot plant are LPCE(liquid phase catalytic exchange) and CD (cryogenic distillation). Deuterium is separated from heavy water in LPCE process and concentrated in CD process. CD process consists of cold box, where are a distillation column and heat exchangers, vacuum system, cryogenic refrigerant supply system and instrument & control system. The experience of the pilot plant will be used in WTRF design review, operating procedure revision and fundamental education for the operators.

Keywords