Analysis of F/M Duty Cycle and O/M Cost for Four-Bundle Shift Refuelling Scheme in CANDU6 NPP

  • Ihn Namgung (Korea Power Engineering Co.) ;
  • Na, B.G. (Korea Power Engineering Co.)
  • 발행 : 2001.05.01