A Study on the Delay Claim in Construction Projects

계약공사기간 연장에 의한 클레임 처리방안

  • 노병옥 (서울시립대학교 부설 산업경영연구소) ;
  • 이상범 (동의대학교 건축공학과) ;
  • 이호일 (명지대학교)
  • Published : 2001.11.01

Abstract

If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.