New Rehabilitation Method of Prestressed Concrete Rahmen Bridge with a Hinge at Midspan

프리스트레스트 콘크리트 활절 라멘교의 신보강공법 (상진대교구교적용)

  • 이원표 (현대건설(주) 기술연구소) ;
  • 하성욱 (현대건설(주) 기술연구소) ;
  • 김성호 (현대건설(주) 기술연구소)
  • Published : 2001.11.01

Abstract

The Sang-Jin bridge constructed by the Free Cantilever Method in 1985 is 4-span concrete rahmen bridge with a hinge at midspan. Due to the effect of creep, shrinkage of concrete and relaxation of tendon, the Sang-Jin bridge exposed the excessive displacement at midspan with the passage of time. In order to improve the load-carrying-capacity and durability of the bridge, needs to repair and rehabilitate the structure emerged. New rehabilitation methods were applied such as external prestressing of concrete box, application of pier pre-camber and steel truss jacking. Structural analysis and several tests including static load test, dynamic load test and ambient vibration test were executed to verify the improvement. The test result showed that the displacement of the midspan was improved by 10mm and it was verified that the stiffness of the bridge was increased. Totally, the load-carrying-capacity of Sang-Jin bridge was increased at least 1.56times which was attributed to the new rehabilitation method.

Keywords