Investigation on the Validities of Removal Time of the Forms Considering Rebound Number of P Type Shumidt Hammer

P형 슈미트 햄머의 반발도를 이용한 거푸집 탈형시기의 결정에 관한 타당성 검토

  • Published : 2001.11.01

Abstract

This paper presents the validities of the removal time of side forms considering the relationship between rebound number of P type schmidt hammer and compressive strength. According to test results, compressive strength of 40% of W/C at 12 hours shows 16kgf/$cm^{2}$ and 50% of W/C at 15 hours, 13kgf/$cm^{2}$. Rebound number at 9 hours after casting shows 13 and 9 (W/C 40% and W/C 50%). According to the regression analysis, rebound number of P type schmidt hammer to gain 50kgf/$cm^{2}$ of is estimated 20.1. It is thought that desirable rebound number of P type schmidt hammer to gain 50kgf/$cm^{2}$ is determined 25 considering safety factor.

Keywords