Remote On-line Determination of the Load Rate Limit of Generation in AGC

AGC 운용에 있어서의 원격 On-line 최대 증감발율 취득 기법

  • 권순만 (한국전력연구소 계측제어 연구 그룹) ;
  • 전동훈 (전력연구원 전력 계통 안정화 그룹) ;
  • 문원용 (한국전력연구소 계측제어 연구 그룹) ;
  • 김석주 (한국전력연구소 계측제어 연구 그룹)
  • Published : 2000.11.25

Abstract

The possibility of a remote on-line determination of the maximum load rates that are basically set at generation plants is investigated in automatic generation control (AGC) system. Energy management system (EMS) generates a test input to a remote power plant to get the samples of the generator output. Then from the samples it can be attempted to determine an approximate value of the load rate limit set by the operator. It is shown in computer simulation that in actual power plants the limit can be approximately determined from the input-output characteristics of the plants for a unit-step input.

Keywords