A Study on the Construction of Test Track for Automated Guideway Transit

경량전철 시험선 구축에 관한 연구

  • Published : 2000.05.01

Abstract

As the AGT system has never operated in Korea, the construction of test track is essential to the acquisition of safety for the passengers. However, the test track is a synthetic system including vehicle, power system, signalling, track etc, several factors must be considered. In this paper, we suggest the general guideline for the test track of AGT system and test items on test track through the investigation of leading test facilities in the world. Through continuous study and investigation, we finally will build the test track to verify the reliability requirements between the train and infrastructures

Keywords