A study of CWR on railway viaduct with sharp curves

철도고가교 급곡선부 레일장대화 방안연구

  • Published : 2000.05.01

Abstract

The Seoul Subway Line 4 crossing downtown diagonally constructed in February 1980 and opened on October 11, 1983. The line 4 is thus able to link southern and northern parts of Seoul with the downtown as well as with the Seoul outskirts. More than 810,000 people use it everyday. Line 4 was constructed like Line 1,2,3 with ballast track system causing much maintenance cost gradually and espicially much public discontent due to wheel and rail contact noise by railway viaduct with sharp curves. CWR on railway viaduct with sharp curves, 180m$\leq$R$\leq$300m, hasn't been designed and constructed ever in domestic. Therefore in order to reduce noise and vibration caused by interaction between wheel and rail the possibility and the methods of CWR(Continuous Welded Rail) on railway viaduct with sharp curve less than R300 will lead it to the maintenance free system.