Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2000.03c
- /
- Pages.55-69
- /
- 2000
A Case Study on Instrumentations of a Large Section Tunnel Crossing under the Existing Subway Structure
기존 지하철 구조물 하부횡단 대단면 터널의 계측관리 사례
- Published : 2000.03.01
Abstract
Keywords