새만금사업에 따른 조류속 및 유향 변화(농지조성 및 농어촌정비)

Changes of Tide Velocity and Direction with Saemangeum Project

  • 발행 : 2000.10.01

초록

This study was carried out to investigate the changes of tide velocity and sea bottom topology during the construction period of sea dike. The tide velocity and sea bottom depth were measured in Saemangeum area every year, and analyzed and compared to the initial data. The current and future changes of the tide velocity and direction according to the construction of Saemangeum sea dike were presented.

키워드