Determination of Blast Load on the Boreholes Wall Using Decoupled Charge

Decoupling 장전시 천공벽에 작용하는 발파하중의 산정

  • 김상균 (고려대학교 토목환경공학과) ;
  • 이인모 (고려대학교 토목환경공학과) ;
  • 최종원 (고려대학교 토목환경공학과) ;
  • 김신 ((주) 삼보기술단 지반부) ;
  • 이두화 ((주) 삼보기술단)
  • Published : 1999.10.01

Abstract

In tunneling and road cuts by blasting, it is of the utmost importance that the remaining rock is of high quality in order to avoid rockfall, rockslides and excessive maintenance work. Therefore, numerous blasting techniques which make use of decoupled charge or shock wave superposition effect have been used to control overbrake. In this paper. some approximate method for the determination of blast load according to the charge condition was introduced at first and, instrumented tests were conducted in small scale transparent material to investigate the shape and amplitude of blast load around the bore hole. Compare to the fully coupled charge, low amplitude of blast load around the bore hole was observed in the decoupled charge and explosion gas pressure was important in the shape of blast load. Therefore, quasi-static behaviour of the crack pattern was shown due to low loading rate.

Keywords