Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 1999.10a
- /
- Pages.139-146
- /
- 1999
A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM
실트질 지반에 굴착된 NATM 터널의 시공사례 연구
Abstract
Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When