Proceedings of the Korean Society of Agricultural Engineers Conference (한국농공학회:학술대회논문집)
- 1998.10a
- /
- Pages.401-406
- /
- 1998
Ground Behavior Analysis of Excavation near High Rising Building and Field Observation Control
도심지 굴착에서 지반의 거동예측과 계측관리
Abstract
This study aimed at the technique for the construction control in braced excavation works. Selecting a case of Kwangju subway works, field observational values were compared with prediction using Plaxis's. Maximum observational values relevant to both horizontal and vertical proved satisfactory in that they were within the criteria. Numerical results by used Plaxis were overestimated greater than observational values, which meant the prediction were safe tendency. .It must be emphasized that displacement measurement for neighboring important structures should be carried out in order to take countermeasure charge for construction methods, in case that the risk or failure was previewed.
Keywords