Proceedings of the Korean Nuclear Society Conference (한국원자력학회:학술대회논문집)
- 1998.05a
- /
- Pages.398-403
- /
- 1998
Evaluation of Load Rejection to House Load Test at 50% Power for UCN 3
- Lee, Chang-Gyun (Korea Power Engineering Company, Inc) ;
- Suk whun Sohn (Korea Power Engineering Company, Inc) ;
- Sohn, Jong-Joo (Korea Power Engineering Company, Inc) ;
- Seo, Jong-Tae (Korea Power Engineering Company, Inc) ;
- Lee, Sang-Keun (Korea Power Engineering Company, Inc) ;
- Kim, Youngsung (Korea Electronic Power Corporation) ;
- Nam, Kyu-Won (Korea Electronic Power Corporation) ;
- Jung, Yang-Mook (Korea Electronic Power Corporation) ;
- Chae, Kyeong-Sik (Korea Electronic Power Corporation)
- Published : 1998.05.01
Abstract
The Load Rejection to House Load test at 50% power was successfully peformed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3&4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design.
Keywords