목표계획법의 우선순위 가중치 결정에 관한 연구

  • 이상설 (구미전문대학 산업경영과) ;
  • 이철우 (건국대학교 산업공학과)
  • Published : 1997.10.01

Abstract

This paper presents an improved IS(Information System) project selection methodology through the ANP(Analytic Network Process) method within a Goal Programming model framework. This new methodology helps us to overcome the weaknesses according to the dependence for each element and the feedback effects in hierarchy level of the AHP and the GP models. A simple numerical example and limits of this methodology reviewed.

Keywords