Calculation of Avoided Generation Cost of a IPP Based on Generation Expansion Plan of Korea

전원개발계획에 기초한 민자발전소의 회피발전비용 계산에 관한 연구

  • Published : 1997.07.21

Abstract

Electric business all over the world is dramatically changed from vertically integrated monopoly to competition systems. Also, independent power producers(IPPs) will start their commercial operation from the year 2001 in Korea. In this regard, determination of the transaction cost between IPPs and electric utilities will be a hot issue, and electric utilities requires a new framework to support their decision-making. This paper presents the concept of the avoided cost which can be used for economic studies. This paper also describes a novel algorithm to evaluate the avoided cost of a IPP. The case studies are performed on the basis of the official generation expansion plan of Korea by using the Wien Automatic System Planning Package(WASP).

Keywords