Proceedings of the Korean Operations and Management Science Society Conference (한국경영과학회:학술대회논문집)
- 1996.04a
- /
- Pages.365-368
- /
- 1996
An operation scheme for the mixed model assembly lines scheduling
혼류 조립 생산 라인 계획 운영 구조
- Published : 1996.04.01
Abstract
The setting of the factory under this study is as the following. There are multiple assembly lines. Each line can handle any of given set of products. Furthermore each line is capable of assembling several products concurrently, i.e. mixed model assembly line. An incoming production order is characterized by its due-date, product type and quantity. Under this setting we first have to select the starting time and the place(assembly line) for an order to be processed. We also have to devise a way to control orders to be manufactured as scheduled. Finally there should be a mean to reschedule orders when something unexpected happens. This paper offers a scheme that provides the above mentioned necessities. It also provides a case where the scheme is applied.
Keywords