An approximation method for job shop scheduling problem with sequence independent setup time

준비시간을 고려한 job shop 스케쥴링 문제의 근사적 해법에 관한 연구

  • Published : 1996.04.01

Abstract

The job shop scheduling problem has been a major target for many researchers. And, most of the past studies did not consider setup time. In many cases of real manufacturing environment, however, there exists a setup time for each operations. The setup can be divide into two parts, one can be done after job arrival. The setup time based on the latter can be summed together with processing time, but that based on the former can not be. We propose an approximation method based on shifting bottleneck procedure for solving the job shop scheduling problem with sequence independent setup time. It schedules the machines one by one, taking a bottleneck machine among the machines not yet scheduled. Every time after a new machine is scheduled, all schedules previously established are updated. Both the bottlenck search and the schedule updating procedure are based on solving a single machine scheduling problem with ready time, setup time and delivery time iteratively.

Keywords