Evaluation of Atmospheric Dump Valve and Turbine Bypass Valve Capacities for YGN 3

  • 발행 : 1995.10.01

초록

The Atmospheric Dump Valve (ADV) and Turbine Bypass Valve (TBV) capacity test was performed at 30% power level during the YGN 3 Power Ascension Test period. In this test, several plant data were measured to calculate the ADV and TBV capacity considering that critical condition was developed through the ADV and TBV. The test results show that the test acceptance criteria are met.

키워드