Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 1993.03a
- /
- Pages.15-20
- /
- 1993
Design and Construction Problems of NATN Tunnel Emerged from Seoul Subway Construction
서울 지하철 건설에서 조명된 NATM 터널의 설계 및 시공상의 문제점
Abstract
NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.
Keywords