Study on application of domestic development DCS for S/H temp in the power plant

발전소 과열증기 온도제어 시스템의 국산 DCS 적용에 관한 연구

  • Published : 1992.10.01

Abstract

There are lots of disturbance in the super heater temperature control system of power plant boiler as follows. 1.Burner light off. 2.Excess Air. 3.Burner tilt. 4.G.R fan flow. Temperature control system of super heater in the power plant has delay time about 5 min. So it is difficult to control the super heater temperature in the power plant. This paper show us the application of domestic development DCS to control the super heater temperature in seoul #5 thermal power plant unit.

Keywords