Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 1991.10a
- /
- Pages.123-132
- /
- 1991
특정 사례터널 해석 결과 및 평가
- Lee, Seung-Rae (Korea Advanced Institute of Science and Technology) ;
- O, Se-Bung (Korea Advanced Institute of Science and Technology) ;
- Baek, Gyu-Ho
- Published : 1991.10.01
Abstract
The GEOKST program was used to solve the tunnel example problem. The package can solve such geotechnical problem as excavation, embankment, foundations, etc., in which the soil can be modeled by various elastoplastic geomaterial models. The main objective was to consider the effects of excavation depth to the face of the tunnel on the stability of the ground and support system. Depended on the strength of the ground materials, the limit excavation depth without any support system could be established by analyzing three-dimensional excavation problem. In this given example problem, the strengths of the ground materials were enough for the stability of the tunnel without any support system up to fairly deep excavation and the maximum tunnel section displacement was stabilized as the excavation proceed. The asymptotic value was approximately the same as that of the plane strain analysis. Thus, assuming the plain strain condition and simulation the actual excavation procedure, the maximum tunnel section displacement was caculated after final step. The maximum calculated displacement occured at the top section of the tunnel geometry and was about 8mm.
Keywords