Acknowledgement
Supported by : 국토교통부
References
- B. S. Kim, J. G. Jeun, "A Study on Estimation Model of Construction Duration for Public Construction", Korea Journal of Construction Engineering and Management, vol. 6, no. 6, pp. 142-151, 2005.
- WINSUN, Available From: https://futureofconstruction.org/case/winsun/ (accessed Oct., 31, 2017)
- Aundrey Rudenko, Available From: http://www.totalkustom.com/ (accessed Oct., 31, 2017)
- Controur Crafting, http://contourcrafting.com/(accessed Oct., 31, 2017)
- IMCRC Center, http://imcrc.org/ (accessed Oct., 31, 2017)
- Apis Cor., http://apis-cor.com/en/(accessed Oct., 31, 2017)
- C. W. Koo, "A CBR-based Hybrid Model for Predicting Construction Duration and Cost based on Project Characteristics in Multi-Family Housing Projects", University of Seoul, 2007.
- D. K. Seol, D. Y. Kim, D. Y. Kim, S. C. Jeong, Y. K. Huh, "Determination Model of Optimum Construction Duration of Apartment Structural Frameworks", Journal of architectural institute of korea, vol. 32, no. 12, pp. 61-68, 2012. DOI: http://dx.doi.org/10.5659/JAIK_SC.2016.32.12.61
- I. W. Choi, O. K. Kim, "A Study on Construction Duration Considering Qualitative Element", Journal of architectural institute of korea, vol. 18, no. 2, pp. 695-700, 1998
- H. S. Koo, B. C. Choi, "A Study on the Estimation of Construction Period Considering Weather Factor in Building Construction", Journal of architectural institute of korea, vol. 15, no. 11, pp. 87-96, 1999.
- Korea Land and Housing Corporation, Construction Standard Specification, 2003.
- Korea Concrete Institute, Standard Concrete Specification, 2003.