Analysis of cause and deterioration about using 3-Arch tunnel

공용중인 3-Arch터널의 열화조사 및 원인분석

  • Published : 2009.03.27

Abstract

This paper studied the cause of the deterioration of the four 3-Arch tunnels built in mid-1990. The common deteriorations of the four 3-Arch tunnels were longitudinal cracks, leakage and efflorescence at the same parts of lining concrete. Three fourths of 3-Arch tunnels, there was high percentage longitudinal cracks and a quarter was low frequency about longitudinal cracks. So the material reviewed to find out the differences between two groups in construction process and analysis was conducted such as non-destructive testing, precise visual survey and safety evaluation of one tunnel which had bad ground condition As the result, the tunnels were safety condition and the primary deterioration occurred during the construction process, namely, problems arrangement of rebar and the effects of the blast at middle tunnel.

References

  1. 건설진흥공단 (1997), 서울지하철 시공감리용역(토목) 시공감리종합보고서(구조 및 토질), pp. 847-848.
  2. 김상수 (1995) 역, 도시터널의 NATM공법, 창우출판, pp. 43-44
  3. 김승렬 (2004), 서울특별시 지하철건설본부 도시철도기술자료집(3), 터널, pp. 155-157.
  4. 대한토목학회 (2004), 경의선 및 인천국제공항철도 지하철2호선 상하부 통과구간 안전성보고서, p. 87.
  5. 석종우 외 3 명 (2004), "대전지하철 3 아치터널공사", 한국지반공학회 , 제 20권 제 2호.
  6. 이성민 (2004), 서울특별시 지하철건설본부 도시철도기술자료집(2) 개착터널, 제6장 잠고자료, p. 671.
  7. 한국시설안전공단 (2009), 시설물정보관리종합시스템 (www.fms.or.kr)
  8. 한국터널공학회 (2007), 터널의 이론과 실무(9장 콘크리트라이닝 설계편), 구미서관 pp. 310-320.
  9. 홍성영 역 (1993), 터널의 설계이론, 탐구문화사, pp. 57-58.