Abstract

The application of TBM tunneling has been progressively increased since the first entrance into Korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction result TBM tunneling. This study compared an analyzed result with TBM tunnelling construction results of Korea, America, Japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when similar construction apply TBM method to planning steps.

Keywords

TBM method;TBM efficiency;TBM boring

References

  1. 박용운, 박홍조, HARD ROCK에서의 TBM공법 적용 사례, 한국지반공학회, 대한터널협회, 지하공간 건설에 대한 심포지움 논문집, 1996, pp 11-15
  2. 이용일, 박홍조, 김도완, 허성룡, 터널굴착에서의 TBM 공법 적용사례, 1997, pp 1-14
  3. 도화종합설계공사, 울산공법용수 PROJECT 설계보고서, 도화종합설계공사, 2000, pp 17-41
  4. 유원건설, Tunnel Boring Machine Method, 유원건설, 1993. pp 1-20
  5. David Marin, "Proven TBM's Turn Power up in Norway Tunneling,“ 1988, pp 41-51
  6. T.nishida, Y.matsumura, "Rock Mechnical Viewpoint on Excavation of Pressure Tunnel by TBM“ 1993, pp 12-17